~-
1
STARTING SYSTEM - PRE-HEATING SYSTEM
INTAKE HEATER RELAY INSPECTION
1.
REMOVE INTAKE HEATER RELAY
Intake
I-'cf-Heater
Relay
ST-5
2.
INSPECT INTAKE HEATER RELAY
A.
Inspect feley continuity
(a)
Using an ohmmeter. check that there is continuity
between terminals e and g.
(b)
Check that there is no continuity between terminals B
and G.
If continuity is not as specified. replace the relay.
No Continuity
Continuity
Continuity
B.
Inspect reley operation
(a)
Apply battery voltage across terminals e and g.
(b)
Using an ohmmeter. check that there is continuity
between terminals Band G.
If operation is not as specified. replace the relay.
3.
REINSTALL INTAKE HEATER RELAY
."
..