Base Station Mounting - Avaya DECT R4 Installation Manual

Ip office release 7.0
Table of Contents

Advertisement

3.5 Base Station Mounting

The base station can now be powered down and mounted in its intended operating position. The removable bracket on the
back of the base stations can be used for either wall mounting using two screws suitable for the surface or for mounting
on columns using two metal bands.
Wall Mounting
Remove the mounting bracket from the base station. Use it as a template for marking the screw fixing holes. Note the
diagram below indicating the required clearance for getting the base station onto the mounting bracket.
1. Hold the mounting bracket with its flat side against the wall with the text 'TOP' upwards and mark the two holes.
Observe the minimum distance between the top screw hole and the ceiling as indicated in the diagram above.
2. Drill the two holes using a 6mm diameter drill and insert the included wall plugs.
3. Position the mounting bracket with its flat side to the wall and fasten it with the two included 3.5mm diameter
screws.
DECT R4
IP Office Release 7.0
15-601047 Issue 03a (21 February 2011)
Page 56

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip office dect r437403749

Table of Contents