Installation Procedure; Exhaust System - Terex PT-100G Forestry Service Manual

Compact track loader
Hide thumbs Also See for PT-100G Forestry:
Table of Contents

Advertisement

Compact Track Loader
12. Engine
12-3
4. Remove the battery from the tower compartment
(fig. 12-3).
Installation
1. To install the battery, reverse the removal
procedure.

Exhaust System

Removal
Required Tools
Pry Bar(s)
Combination/Socket Wrench
Rubber mallet
Penetrating Lubricant
The exhaust system is very hot at
operating temperature. Make sure the
machine is off and cool before attempting
to service the exhaust system.
1. Perform the radiator/oil cooler removal procedure
on page 8-3 to provide access to the exhaust
system components.
12-4
2. Remove the bolts securing the rear belly pan and
remove it from the machine (fig. 12-4).
12-5
3. Remove the nuts securing the head-pipe to the
turbo, then pull it away from the studs (fig. 12-5).
12-6
4. Remove the tension springs that secure the middle
pipe section to the head (upper) pipe and muffler
inlet (lower) pipe (fig. 12-6).
12-7
5. Remove the upper and middle pipe sections from
the machine (fig. 12-7).
6. Remove the clamps that secure the inlet and outlet
pipes to the muffler (fig. 12-8).
12-2
Spring

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt100g

Table of Contents