Terex PT-100G Forestry Service Manual page 107

Compact track loader
Hide thumbs Also See for PT-100G Forestry:
Table of Contents

Advertisement

16-19
16-20
7. To remove solenoids, unplug wiring harness from
solenoids, then remove fastener and clamp as
shown. (fig. 16-19, 16-20)
16-21
8. Remove solenoid from valve. Inspect solenoid and
o-rings for damage, replace if necessary (fig. 16-
21)
16-22
9. Remove the six fasteners that secure solenoid
block to valve . (fig. 16-22)
16. Hydraulic Component Service
16-23
10. Remove solenoid block from valve, inspect the o-
rings for damage, replace if necessary. (fig. 16-23)
16-24
11. Remove reliefs from valve, inspect relief and o-
rings for damage, replace if necessary. (fig. 16-24)
Assembly
1. Install new seals and components in place of the
originals as necessary paying close attention to
location and orientation to ensure proper function.
2. Thoroughly clean all components to prevent sys-
tem contamination.
3. Reassemble components by reversing the disas-
sembly process.
16-5
Compact Track Loader
O-rings

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt100g

Table of Contents