Terex PT-100G Forestry Service Manual page 94

Compact track loader
Hide thumbs Also See for PT-100G Forestry:
Table of Contents

Advertisement

Track Loader
Compact
14. Lift-Arm Components
14-1
1. Rest the lift arms on an Terex approved jack stand
to provide clearance for lift cylinder removal. (fig.
14-1)
14-2
2. Disconnect the inlet and outlet hoses from the
cylinder. (fig. 14-2)
14-3
3. Label the hoses according to right and left orienta-
tion to simplify reassembly, then cap and plug the
hoses and fittings to prevent fluid loss and or sys-
tem contamination. (fig. 14-3)
14-4
4. Remove the bolts securing the front and rear lift
arm cylinder pivot pins to the lift arm and lift arm
tower. (fig. 14-4)
14-5
5. Remove the grease fitting from the pivot pins to
allow the installation of the pin removal tool. (fig.
14-5)
14-6
6. Thread the removal tool into each pin, then use
the slide hammer to extract them. (fig. 14-6)
14-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt100g

Table of Contents