Terex PT-100G Forestry Service Manual page 105

Compact track loader
Hide thumbs Also See for PT-100G Forestry:
Table of Contents

Advertisement

16-8
16-9
11. Remove the seals and piston rings taking care not
to scratch the piston. Also, pay close attention to
seal and ring orientation and position to aid when
installing new parts. (fig. 16-8, 16-9)
16-10
12. Gently tap the end gland off of the cylinder rod.
(fig. 16-10)
16-11
13. Remove the tandem seals from the end gland pay-
ing close attention to the order of removal to aid
during installation of the new seals. (fig. 16-11)
16-12
14. Remove the inner seal from the end gland. Pay
attention to the seal orientation upon removal to
aid during installation of the new seal. (fig. 16-12)
15. Remove the end gland outer seal from the end
gland. (fig. 16-10)
16. Thoroughly clean all parts to prevent contamina-
tion of hydraulic oil when reinstalled.
Outer Seal
Assembly
1. Install new seals and components in place of the
originals paying close attention to orientation and
location to ensure proper operation.
2. Lubricate the piston, ring, and seals with fresh
hydraulic oil prior to assembly to avoid damage.
3. Reassemble components by reversing the disas-
sembly process.
Note: During reassembly, use an impact wrench to tighten
the piston retaining lock nut. Make sure the nut is tight and
that there is no independent movement between the piston
and rod before reassembling.
16-3
Compact Track Loader
16. Hydraulic Component Service

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt100g

Table of Contents