An access point installation includes mounting the access point, connecting the access point to the
network (LAN or WAN port connection), connecting antennae and applying power. Installation
procedures vary for different environments. See the following sections for more details:
•
Precautions
•
Requirements
•
Access Point Placement
•
Power Options
•
Symbol Power Injector and Power Tap Systems
•
Mounting an AP-5131
•
AP-5131 LED Indicators
•
Mounting an AP-5181
•
AP-5181 LED Indicators
•
Setting Up MUs
Hardware Installation