Unpacking And Installation; Ultra-Microbalaces Uya 3Y - RADWAG UYA 3Y User Manual

Balances 3y series
Hide thumbs Also See for UYA 3Y:
Table of Contents

Advertisement

2. UNPACKING AND INSTALLATION

2.1.

Ultra-microbalaces UYA 3Y

After ultra-microbalance installing at operating place, following should be set:
1 – pan shield
2 – bottom ring
3 – balance pan
4 – glass cover
After the elements setting, additional devices should be connected and balance should be
plugged to power source. Power socket is located on back side of electronic module.
- 10 -

Advertisement

Table of Contents
loading

Table of Contents