Installing Cable Management Frames Onto The Chassis - Cisco Nexus 7706 Hardware Installation Manual

Nexus 7000 series
Hide thumbs Also See for Nexus 7706:
Table of Contents

Advertisement

Installing Cable Management Frames onto the Chassis

Figure 16: Connecting the Grounding Cable to the Ground Port on the Cisco Nexus 7706 Chassis
1
Front ID Door
Note
Use the ground port in the back of the Cisco Nexus 7706 chassis for primary earthing when you use the front
ground port for grounding the removable door.

Installing Cable Management Frames onto the Chassis

Before you begin
• The chassis must be installed and secured to the rack.
• You must have the following tools and equipment:
Cisco Nexus 7706 Hardware Installation Guide
36
• Manual Phillips screwdriver with torque capability (customer supplied).
• The following frames and screws (shipped with the switch):
• Two cable management side frames
• One cable management top hood frame
• 22 M4 x 12-mm, flat-head, Phillips screws
2
Grounding Cable connected to Ground port on the
chassis
Installing the Switch Chassis
OL-31330-01

Advertisement

Table of Contents
loading

Table of Contents