Project Information; Setting The Project Workspace - Extreme Networks Summit WMScanner User Manual

Table of Contents

Advertisement

WMScanner GUI and Menus
Show Distance
Between Points
Preferences
WMS Configuration

Project Information

You can view and edit information about the current project. Select Utilities > Project Information. When
the Project Information dialog appears, optionally enter Project, Customer, and Notes information and
select OK when finished.

Setting the Project Workspace

To set the project workspace, select File > Set/Create Project Workspace. The Project Workspace selection
dialog appears:
50
This command prompts the user to select points in a drawing; Summit
WMScanner draws temporary line segments between consecutive points. While
the mouse cursor is moved around, a tool tip displays the sum of the lengths of
the line segments. Pressing ESC once will cancel the current set of lines, and
pressing ESC again will terminate the command. The distance is based on the
current scale of the drawing.
This command brings up an Options dialog box that allows you to configure
various Summit WMScanner settings with respect to File, Display, Save, Plotting,
User preferences, Drafting, and Selection.
Use this option to save WMS configuration information to a WMS server. If a
target WMS server has not been specified, a dialog displays where the WMS
Server IP address and port can be defined as well as the user permissions
required to initiate the operation.
Summit WMScanner Users Guide