Step 4: Connect I/O
Cabling and Wiring
Install any one of the following application modules in slot 3-6:
n
DS3 UNI
n
E3 UNI
n
OC3/STM-1 UNI
n
DS1 UNI with IMA
n
E1 UNI with IMA
n
Ethernet
n
CBR DSX
n
CBR-E1
n
QSIM (Quad Serial Interface Module)
n
HSIM (HSSI Module)
n
FAM (Frame Access Module)
n
This section tells you how to connect I/O cabling and wiring once the modules are
installed in the shelf and describes the common and module-specific front panel
LEDs. Figure 6 shows an example of a PathBuilder S600 configuration with all of
the associated cabling connected.
Figure 6 Sample Full System Configuration
VT100 Terminal
Initial
Network
Management
Management
Connection to
Station
Add an IP
Address for LAN
Management
Step 4: Connect I/O Cabling and Wiring
Slot 6
Slot 5
Slot 4
Local
T1 Timing
Alarm
Source
System
33
DS3
Line
CSU or
CPE
Need help?
Do you have a question about the 3C63100-AC-C - PathBuilder S600 Bridge/router and is the answer not in the manual?