The wavelength recalibration should be performed after at least 10 minutes of warm-up
N O T E
time of the lamp.
4 If detector main board was replaced, re-enter the serial number
1100 Series DAD and MWD User Manual
information of the module through the user interface, see
Control Module G1323B"
in the Service Manual.
or
"Using the Agilent ChemStation"
Maintenance
8
"Using the
as described
151