Agilent Technologies 1100 Series User Manual page 142

Diode array and multiple wavelength detector sl
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

8
Maintenance
20
Insert the flow cell capillaries and tighten them fingertight.
Use the wrench and torque adapter as described on
page 143
and tighten the fittings alternately.
22
Re-install the flow cell and connect the capillaries to the
union holder.
The cell body can be fitted in two positions to allow the capillaries routed upwards or
N O T E
downwards (depending on where the column is located). Route the capillaries directly
column (inlet) and waste assembly (outlet).
142
21
Reassemble the flow cell body to the holder.
Next Steps:
23
Perform a leak test with the flow cell outside of the
detector.
24
If no leak is observed, install the flow cell and you are
ready to work.
25
Make sure that the flow cell assembly is inserted correctly
and fits perfectly in the optical unit (especially when PEEK
capillaries are used).
1100 Series DAD and MWD User Manual

Advertisement

Table of Contents
loading

Table of Contents