8
Maintenance
Next steps:
9
Reconnect the capillaries, see
10
Perform a leak test.
11
Insert the flow cell.
12
Replace the front cover.
13
Perform a
"Wavelength Verification and Recalibration"
check the correct positioning of the flow cell.
128
"Exchanging a Flow Cell"
or a
on page 121.
"Holmium Oxide Test"
1100 Series DAD and MWD User Manual
as described in the Service Manual to