6
Insert the flow cell while pressing the flow cell holder.
Note:
To check for leaks, establish a flow and observe the
flow cell (outside of the cell compartment) and all
capillary connections.
1100 Series DAD and MWD User Manual
7
Insert the flow cell capillaries into the union holder (top is
inlet, bottom is outlet). Tighten the thumb screw and
Reconnect the waste tubing (bottom) to the union.
inlet
outlet
thumbscrew
Next steps:
8
Perform a
"Wavelength Verification and Recalibration"
described in the Service Manual to check the correct
positioning of the flow cell.
9
Replace the front cover.
Maintenance
8
waste
as
123