8
Maintenance
6
Fix the inlet capillary to the flow cell body handtight first.
Then do a 1/4 turn with a 4-mm wrench.
138
Next steps:
7
8
9
Inlet capillary
10
11
Reconnect the capillaries, see
Cell"
on page 121.
Perform a leak test.
Insert the flow cell.
Replace the front cover.
Perform a
"Wavelength Verification and Recalibration"
a
"Holmium Oxide Test"
as described in the Service
Manual to check the correct positioning of the flow cell.
1100 Series DAD and MWD User Manual
"Exchanging a Flow
or