Unpack And Inspect Equipment - Fujitsu 1FINITY L100 User Manual

Table of Contents

Advertisement

Equipment Installation

Unpack and Inspect Equipment

4.3

Unpack and Inspect Equipment

Warning: The blade, PIU, or pluggable module (SFP/SFP+/CFP4) can be damaged by Electrostatic Discharge
(ESD) during installation or removal. Ensure that ESD handling precautions are observed, when handling
equipment to prevent possible ESD equipment damage.
Warning: Use two hands when handling the blade to avoid damaging the unit.
Step 1
Before unpacking the equipment, inspect the shipping containers for signs of damage.
Note: Claims for shipping damage must be filed with the transportation company in accordance with their
published procedure. Contact Fujitsu Sales Representative for any shipment questions.
Step 2
Unpack and carefully remove the equipment from its shipping container and place it on a clean, level, and ESD-
safe surface. Use two hands as shown in the following figure to remove a blade unit from container.
Attention: Leave the blade or PIU in the ESD-protective plastic bag until ready for installation.
Lift here.
Do not lift here.
Figure 30
Removing Blade from Packing Container
Step 3
Inspect the equipment to ensure that it is free of any defects, damage, or other debris. If the equipment is
damaged, follow local practices/procedures for repair or replacement of the damaged unit, as applicable.
·
Release 19.1.1
Issue 1.1, May 2021
Fiber Management Arm
Lift here.
Do not lift here.
104
Fujitsu and Fujitsu Customer Use Only

Advertisement

Table of Contents
loading

Table of Contents