Before Installing The Main Unit; Checking Environmental Conditions; Preparing The Power Supply Equipment; Electrical Specifications - Fujitsu PRIMEQUEST 2000 Series Installation Manual

Primequest 2000 series
Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 2 Preparing for Main Unit Installation

2.2 Before Installing the Main Unit

2.2
Before Installing the Main Unit
Be sure that you understand the system configuration and have acquired all the requisite installation information before
installing the main unit.
For a system overview and details on the system configuration, see the PRIMEQUEST2000 Series General Description
(CA92344-0534). For details on the installation prerequisites, see the PRIMEQUEST2000 Series Hardware Installation
Manual (CA92344-0535).
2.3

Checking Environmental Conditions

This section describes the environmental conditions for main unit installation.
The conditions of the main unit operating environment depend on the altitude of the installation site.
For details on the environmental conditions of the PRIMEQUEST2000 series, see 1.3 Installation Specifications in the
PRIMEQUEST2000 Series Hardware Installation Manual (CA92344-0535).
For details on the recommended temperature and humidity of the computer room, see the SPARC
Enterprise/PRIMEQUEST Common Installation Planning Manual (C120-H007EN).
2.4

Preparing the Power Supply Equipment

This section describes the electrical specifications, facility power requirements, and grounding for the PRIMEQUEST 2000
series. To prevent accidents, confirm that the power supply equipment can supply enough power to the system.
Electricianing and installation work shall conform to local ordinances and local and national government regulations.
For details on the power supply equipment, see the SPARC Enterprise/PRIMEQUEST Common Installation Planning
Manual (C120-H007EN).

2.4.1 Electrical specifications

For details on the electrical specifications of the PRIMEQUEST2000 series, see 1.3 Installation Specifications in the
PRIMEQUEST2000 Series Hardware Installation Manual (CA92344-0535).
For details on the power cables, see 2.2.1 Basic interfaces and peripheral devices in the PRIMEQUEST2000 Series
Hardware Installation Manual (CA92344-0535).
For details on the connectors and their shapes, see 2.4.1 PRIMEQUEST2000 series main unit in the PRIMEQUEST 2000
Series Hardware Installation Manual (CA92344-0535).
4
CA92344-0536-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 2800e

Table of Contents