Chapter 3 Equipment Layout; Proposed Computer Room Top View; Equipment Templates - Fujitsu M10 Series Installation Planning Manual

Hide thumbs Also See for M10 Series:
Table of Contents

Advertisement

CHAPTER 3 Equipment Layout

1
This chapter describes the items which considerations require for when laying out
equipment. Equipment layout deserves special consideration, because it has a
significant bearing on the efficiency of system operation and maintenance.
3.1

Proposed Computer Room Top View

A top view of the proposed computer room must be prepared.
(1) Top view
A precise top view of the proposed computer room must be prepared to aid
in reviewing the equipment layout.
(2) Scale
The top view of the proposed computer room prepared on a scale of one-fiftieth
is recommended.
3.2

Equipment Templates

Equipment templates at a scale of one-fiftieth are recommended. Prepare templates
for the following kinds of equipment:
 Server system main unit
 Console tables
 Equipment installation shelves
 Cabinets used to house small floor-mounted equipment
 Air conditioners
 Power supply facilities
C120-H007-08EN
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise seriesPrimequest series

Table of Contents