Short Compensation Key Sequence - Agilent Technologies 4286A User Manual

Rf lcr meter
Table of Contents

Advertisement

4. Place the shorting device so that it contacts the
electrode.
6. Tighten the two B knobs to x the B stages and the
device holders.
8. Tighten knob A while pushing the lever.

SHORT Compensation Key Sequence

When the test xture is ready for the SHORT compensation sequence, press the following front
panel keys:
5. Adjust the two B stages and the two device holders
to hold the shorting device.
7. 1
Push the lever. 2
Slide stage A while pushing
the lever until the electrode on the stage A slightly
contacts the shorting device.
9. Release the lever to hold the shorting device.
Basic Measurement Procedures
3-17

Advertisement

Table of Contents
loading

Table of Contents