4: Controller Enclosure Component Replacement Procedures
!
62
Caution: To prevent damage to the controller enclosure circuitry, read the following:
You can replace the fan/communications canister while the controller enclosure is in
operation if you complete the exchange within 15 minutes. This time limit applies
only to the total time that the fan/communications canister is out of the controller
enclosure, beginning when you remove the failed canister and ending when you
re-seat the new one. This does not include the time it takes you to do this entire
procedure (such as checking indicators).
4. Remove the failed fan/communications canister from the controller enclosure
(Figure 4-10).
Using a flat-blade screwdriver, loosen the three captive screws on the
fan/communications canister. Use the handle to pull the canister out of the slot a
few inches. Then, grasp the sides of the canister with both hands and remove it from
the controller enclosure.
007-4304-003
Need help?
Do you have a question about the TP9400 RAID and is the answer not in the manual?