Configuration S100687: Agencies / Ait With Efc; Figure 19: Configuration S100687 Rear Panel Connectors; Table 13: Configuration S100687 R - Safran CORTEX CRT Quantum User Manual

Command ranging & telemetry unit
Table of Contents

Advertisement

2.3.3.2.4. Configuration S100687: Agencies / AIT with EFC

The connection of the various signals to the user system is directly performed on the chassis rear panel as
described in 2.3.1.1. The computer connections (LAN, VGA) are directly available on the Industrial Computer
rear panel. The picture below lists and identifies the various connections to the computer ports, and the I/O
connectors of the Cortex CRT Quantum dedicated hardware.
Connecto
r
1
Upper power supply unlock
2
Upper power supply AC input
3
Lower power supply unlock
4
Lower power supply AC input
5
Power supply Sound Alarm Button
6
7
8
9
10
Downlink – RF/IF Nominal 1
11
Downlink – RF/IF Nominal 2
12
Downlink – RF/IF Nominal 3
13
14
15
© Safran Data Systems
COMMAND RANGING & TELEMETRY UNIT CORTEX
CRT QUANTUM USER'S MANUAL

Figure 19: Configuration S100687 Rear panel Connectors

Usage
system
system
Mechanical Ground
NIC1 – LAN
NIC2 – LAN
VGA
USB 3.0
Reference Frequency 1
Uplink – RF/IF Nominal 1
Table 13: Configuration S100687 Rear panel Connectors
This document is the property of
It cannot be duplicated or distributed without expressed written consent.
Connect
or
Uplink – RF/IF Nominal 2
16
17
18
Downlink – IF Alternate 1
19
Downlink – IF Alternate 2
20
Downlink – IF Alternate 3
21
22
23
24
25
26
27
28
29
Test Points, 1-PPS Out, Sync Pulse
30
IRIG In, 1-PPS In, Video In, Auxiliary
Safran Data Systems
.
Ref.
DTU 100042
Is.Rev.
5.17
Date:
Dec.
03, 2021Sept. 30, 2021
Usage
Uplink – IF Alternate 1
Uplink – IF Alternate 2
Reference Frequency 2
AGC out 1
AGC out 2
AGC out 3
Video out 1
Video out 2
Reserved
In
In
Page 11

Advertisement

Table of Contents
loading

Table of Contents