Wait After Power Off; Cpu Load Considerations; Software Loading - Safran CORTEX CRT Quantum User Manual

Command ranging & telemetry unit
Table of Contents

Advertisement

5.1.3.3. Wait after power off

It is recommended to wait for at least one minute to re-power on the chassis after power off.

5.1.3.4. Cpu Load Considerations

SAFRAN DATA SYSTEMS DOES NOT WARRANTY CORTEX CRT QUANTUM PERFORMANCES
IF ADDITIONAL SOFWARE ARE LOADED / EXECUTED ON THE MACHINE.

5.1.3.5. Software Loading

Avoid using floppy disks from unidentified sources. Presence of virus may severely affect the performances of
the equipment or crash the software.
© Safran Data Systems
COMMAND RANGING & TELEMETRY UNIT CORTEX
CRT QUANTUM USER'S MANUAL
This document is the property of
It cannot be duplicated or distributed without expressed written consent.
Safran Data Systems
.
Ref.
DTU 100042
Is.Rev.
5.17
Date:
Dec.
03, 2021Sept. 30, 2021
Page 256

Advertisement

Table of Contents
loading

Table of Contents

Save PDF