ENGINE / COOLING SYSTEM
VALVE COVER INSTALLATION
1. Assemble the valve cover and a NEW gasket
Ensure that the gasket is located in the retaining
groove in the valve cover.
IMPORTANT
Apply liquid engine sealant at the T-Joint
2. Install the cover on the cylinder head and hand start
u
the fasteners
. Using sequence shown, torque
fasteners to specification.
TORQUE
Valve Cover Fasteners:
89 in-lbs (10 N·m)
3.96
3. Install new cable ties
i
.
4. Install the spark plugs
5. Install the ignition coils
9940259 R02 - 2022 RZR PRO R / PRO R 4 Service Manual
y
to the valve cover.
q
and torque to specification.
TORQUE
Spark Plugs:
106 in-lbs (12 N·m)
t
.
© Copyright Polaris Industries Inc.
Need help?
Do you have a question about the RZR PRO R and is the answer not in the manual?