Polaris RZR PRO R Service Manual page 323

Table of Contents

Advertisement

TORQUE
Front Gearcase Torque Sequence:
a. Install vertical bolts on drivers side and torque
nuts until 1-2mm gap
b. Torque Gearcase Isolator bolts: 55 ft-lbs (75
Nm) + 180°
c. Torque vertical bolts: 81 ft-lbs (110 Nm)
7. Install NEW front prop shaft roll pin.
8. Install two front gearcase electrical harnesses.
9. Install front bumper. Torque fasteners to specification.
TORQUE
Front Bumper Fasteners:
37 ft-lbs (50 Nm)
10. Install half shafts into front gearcase.
9940259 R02 - 2022 RZR PRO R / PRO R 4 Service Manual
© Copyright Polaris Industries Inc.
11. Install lower shock and sway bar link onto lower
contol arms. Torque fasteners to specification.
TORQUE
Lower Shock Fasteners:
133 ft-lbs (180 Nm) - Torque bolt side
TORQUE
Sway Bar Link Fasteners:
81 ft-lbs (110 Nm)
12. Install brake disc and caliper assembly. Torque brake
caliper fasteners to specification.
TORQUE
Front Caliper Mounting Bolts:
73 ft-lbs (100 Nm)
13. Install front knuckle assembly and axle nut. Torque
axle nut to specification.
TORQUE
Wheel Axle Nut:
89 ft-lbs (120 Nm)
FINAL DRIVE
8
8.23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr pro r 4Rzr pro r 2022Rzr pro r 4 2022

Table of Contents