PVT SYSTEM
w
5. Install clutch intake hose. Tighten hose clamp
.
Torque hose clamp to specification.
TORQUE
PVT Intake Hose Clamp:
35 in-lbs (3 Nm)
6. Install upper and lower rear close-off panels.
6
7. Install seats. On 4-seat models, install the rear seats.
9940259 R02 - 2022 RZR PRO R / PRO R 4 Service Manual
6.19
© Copyright Polaris Industries Inc.
Need help?
Do you have a question about the RZR PRO R and is the answer not in the manual?