Powering Up The Nodes; Powering Up The Sx-200 El/Ml Control Node; Powering Up The Sx-200 Light Control Node; Powering Up The Peripheral Nodes - Mitel SX-200 EL Technician's Handbook

Hide thumbs Also See for SX-200 EL:
Table of Contents

Advertisement

Powering Up the Nodes

Powering Up the SX-200 EL/ML Control Node

1. Connect the external AC power cord(s) at the rear of the node.
2. Switch on the Bay Power Supply switch to ON. Set the power
switch(es) on the rear of the node to I (ON) or set the Bay Power
Supply switch to I (ON).

Powering Up the SX-200 LIGHT Control Node

1. Connect the external AC power cord(s) at the rear of the cabinet.
2. Set the power switch(es) on the rear of the node to I (ON).
3. Insert the disks into the MCC.

Powering Up the Peripheral Nodes

1. Connect the external AC power cord at the rear of the node.
2. Set the Bay Power Supply switch to I (ON).

Powering Up the IP Node

1. Ensure the SX-200 IP Node is NOT connected to a power source.
2. Using a serial cable, connect a PC to the Maintenance Port on the
IP Node.
3. Launch a data communication application, such as Hyperterminal
on the PC.
4. Set the parameters: 9600, 8, N, 1, None.
5. Plug the IP Node into a power source.
Troubleshooting and Repair
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sx-200 ml

Table of Contents