Tuono V4 1100 Factory
TABLE A1 - LH INSTRUMENT PANEL SUP-
PORT PRE-FITTING
•
Place the cable gland as indicated.
TABLE A2 - ROUTING THE CABLES IN THE
RIGHT SIDE OF THE INSTRUMENT PANEL
SUPPORT AREA
•
Using a rubber cable gland, fasten the
right side light switch wiring harness (1)
with the wiring harness of the demand
sensor (2).
•
The wiring harness of the light switch
must pass between the right side in-
strument panel support and the chas-
sis, as indicated.
BOTH WIRING HARNESSES MUST PASS
ABOVE THE FRICTION CABLE
Electrical system
ELE SYS - 109