Operator Control Of Head And Z Stage Movement - Stratasys Fortus 360mc User Manual

Hide thumbs Also See for Fortus 360mc:
Table of Contents

Advertisement

Operator Control of Head and Z Stage Movement

1.
Moving the Head to the Head Service Location (and Service Bracket).
A.
B.
C.
D.
E.
F.
G.
2.
Moving the Z Stage to Bottom of Travel.
A.
B.
C.
From the Main Menu select
Build Job..
>Operator Control..
Modeler Status..
Maintenance..
Select Move
Head/Stage
Unlock Door <E>
Load/Unload Mtl..
Change Tips/Mtl..
Select
Move Head to Service Location
>Move Head to Service Location <E>
Move Head to Center-Front Location <E>
Move Z Stage to Bottom <E>
Move Relative..
Open the hood door and hood lid.
Loosen the two #8 socket head cap screws on the head.
Place the head in the service bracket by aligning it with the bracket pins.
Tighten one of the #8 socket head cap screws on the head.
From the Operator Control Panel, select
ENTER.
Build Job..
>Operator Control..
Modeler Status..
Maintenance..
Select
Move Head/Stage
Unlock Door <E>
Load/Unload Matl..
Change Tips/Matl..
Select
Move Z Stage to Bottom
Move Head to Service Location <E>
Move Head to Center-Front Location<E>
>Move Z Stage to Bottom <E>
Move Relative..
Operator Control
|*Tips: Model T16
|*
Support T16
and press ENTER.
| Calibrate..
| Temp Control..
|>Move Head/Stage..
and press ENTER.
Operator Control
|*Tips: Model T16
|*
Support T16
and press ENTER.
| Calibrate..
| Temp Control..
|>Move Head/Stage..
and press ENTER.
4-36
and press ENTER.
and press

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents