Amber Generator Off Annunciator Comes On - Textron Cessna Grand Caravan Ex 208B Pilot's Operating Handbook And Faa Approved Airplane Flight Manual

Table of Contents

Advertisement

SECTION 3
ABNORMAL PROCEDURES
ELECTRICAL
MALFUNCTIONS

AMBER GENERATOR OFF ANNUNCIATOR COMES ON

1. BUS VOLTS and GEN AMPS . . . . . . . CHECK and MONITOR
2. STBY ALT PWR Switch. . . . . . . . . . . . . . . . . . . . . . VERIFY ON
IF BUS VOLTS LESS THAN 28.5
3. GEN AMPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHECK
IF GEN AMPS IS 0
a. GEN CONT and
GEN FIELD Circuit Breakers
b. GENERATOR Switch . . . . . . . . . . . . . . . . . . . . . . . . RESET
IF GENERATOR OUTPUT RESUMES
c. BUS VOLTS and GEN AMPS . . . . . . . . . . . . . . . MONITOR
IF GENERATOR TRIPS OFFLINE AGAIN WITH BUS VOLTS
ABOVE 32.5
d. GENERATOR Switch . . . . . . . . . . . . . . . . . . . . . . . . . TRIP
e. AVIONICS BUS TIE Switch . . . . . . . . . . . . . . . . . . . . . . ON
f.
AVIONICS STBY PWR Switch . . . . . . . . . . . . . . . . . . . . ON
g. AVIONICS NO. 1 and NO. 2 Switches . . . . . . . . . . . . . OFF
h. Electrical Load . . . . . . . . . . . . . . . . . . . . . . . . . . . REDUCE
(1) CABIN Lights Switch . . . . . . . . . . . . . . . . . . . . . . . OFF
(2) POWER OUTLET Switch(es) . . . . . . . . . . . . . . . . OFF
(3) BCN Lights Switch. . . . . . . . . . . . . . . . . . . . . . . . . OFF
(4) LDG and TAXI/ RECOG Light Switches . . . . . . . . OFF
Keep LDG and TAXI/RECOG lights OFF until required for
approach and landing. Prior to landing, turn both LEFT and
RIGHT LDG light switches to ON.
3-84
POWER
(top row, first and second breakers from forward end)
NOTE
(Continued Next Page)
U.S.
MODEL 208B 867 SHP
GARMIN G1000
SUPPLY
SYSTEM
CLOSE (push in)
FAA APPROVED
208BPHCUS-00
CESSNA

Advertisement

Table of Contents
loading

Table of Contents