Textron Cessna Grand Caravan Ex 208B Pilot's Operating Handbook And Faa Approved Airplane Flight Manual page 444

Table of Contents

Advertisement

SECTION 6
WEIGHT AND BALANCE/
EQUIPMENT LIST
Partition nets are available for installation at Fuselage Stations 188.7,
246.8, 282.0, 307.0 and 332.0.
If partitions are used, they must be used in conjunction with the cargo
barrier. Partitions are not designed to withstand crash loads, therefore
they cannot be considered as a replacement for the barrier.
Each partition will withstand the forward and aft operational loads applied
during takeoff, flight, and landing by any two zones forward or aft of the
partition. Use of the partitions will allow loading of the zones without tying
down the cargo if the load density is no more than 7.9 pounds per cubic
foot and the zone is more than 75% full. Cargo loading that does not meet
these requirements must be secured to the cabin floor.
6-36
U.S.
CARGO PARTITION NETS
NOTE
Figure 6-8
CESSNA
MODEL 208B 867 SHP
GARMIN G1000
208BPHCUS-00

Advertisement

Table of Contents
loading

Table of Contents