Installing Power Supply (Dkcps); Installing Power Supply (Dkcps) For Dkc - Hitachi DKC910I Installation Section

Hide thumbs Also See for DKC910I:
Table of Contents

Advertisement

Hitachi Proprietary
Rev.0.5
INST(IN)08-04-10

8.4 Installing Power Supply (DKCPS)

The shapes and installation methods of the Power Supply differ depending on each type. Do not make a
mistake to mount the power supply in the specified position.

8.4.1 Installing Power Supply (DKCPS) for DKC

1. Hold up the latch on the cable holder of the Power Supply (DKCPS) to release the lock, and then slide
the cable holder forward.
2. With the lever completely opened, insert the Power Supply (DKCPS) into the slot.
If you cannot insert the Power Supply (DKCPS) into the slot easily, insert it after adjusting the position
by slightly returning the lever.
NOTE : Power Supply (DKCPS1) and Power Supply DKCPS2 have different insertion
3. Push the Power Supply (DKCPS) in all the way.
4. Close the lever completely to fix the Power Supply (DKCPS).
5. Tighten the screw (blue) to fix the Power Supply (DKCPS).
6. Push the cable holder in.
Figure 8-13 Installing Power Supply (DKCPS) (DKC)
DKCPS1
Lever
Screw (blue)
directions.
DKC
Latch
Cable holder
DKC910I
Copyright © 2019, 2021, Hitachi, Ltd.
DKCPS2
[INST(IN)08-04-10]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents