Hitachi DKC910I Installation Section page 128

Hide thumbs Also See for DKC910I:
Table of Contents

Advertisement

Hitachi Proprietary
Rev.1
INST(IN)09-02-60
(1) Connect the X-path cables to each HIE according to Figure 5-9
(LOC05-90). Eight cables need to be connected for VSP 5100 and 5100H, while 16 cables need to
be connected for VSP 5500 and 5500H.
For example, connect the X-path cable to which the red/red label is attached to the HIE-01G 0 port
to which the red/red label (
NOTE: Insert the X-path cable until its latch clicks so that it is fixed firmly.
(2) Connect the X-path cables described in Step (1) to each ISW. Eight cables need to be connected for
VSP 5100 and 5100H, while 16 cables need to be connected for VSP 5500 and 5500H.
For example, connect the X-path cable to which the red/red label is attached to the ISW01 0 port to
which the red/red label (
NOTE: Insert the X-path cable until its latch clicks so that it is fixed firmly.
Figure 9-13 X-Path Cable Connection
Copper Cable
Red/red label
Copper cable
Optical Cable
Optical cable
) is attached.
) is attached.
ISW
ISW01
HIE
HIE-01G
ISW
Red/red label
HIE
Red/red label
Red/red label
Red/red label
ISW01
Red/red label
HIE-01G
Red/red label
Red/red label
Copyright © 2019, 2021, Hitachi, Ltd.
(LOC05-70)
through Figure 5-12
[INST(IN)09-02-60]
DKC910I