Hitachi DKC910I Installation Section page 145

Hide thumbs Also See for DKC910I:
Table of Contents

Advertisement

Hitachi Proprietary
Rev.1
INST(IN)09-03-70
• For VSP 5100 and VSP 5100H in which SSVP 1 is not installed
(1) Connecting the LAN cables to the upper LAN ports on SSVP0
(a) Connect the LAN cable between the LAN port (U1) on SSVP0 and the Management LAN port
on the LAN board 1 in DKC-0.
(b) Connect the LAN cable between the LAN port (U3) on SSVP0 and the Management LAN port
on the LAN board 2 in DKC-1.
(c) Connect the LAN cable between the Maintenance LAN port on the LAN board 1 in DKC-0
and the Maintenance LAN port on the LAN board 2 in DKC-1.
Figure 9-27 Connecting LAN Cables
U3
U2
[U0]
LAN cable
HSNBX-0 前面
Front view of HSNBX-0
U1
U0
(SSVP 0)
(SSVP0)
U1-DKC0
[U2]
DKC-1
LAN cable
DKC-0
HSNBX-1
HSNBX-0
U3-DKC1
LAN cable kit
(SSVP0, U0-U3)
LAN board 2
Management LAN port
Maintenance LAN port
LAN board 1
Management LAN port
Maintenance LAN port
DKC910I
Copyright © 2019, 2021, Hitachi, Ltd.
Rear view
[INST(IN)09-03-70]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents