3. Install the LAN cables.
• For VSP 5500 and VSP 5500H in which SSVP1 is not installed
(1) Connecting the LAN cables to the upper LAN ports on SSVP0 via the LAN cable kit.
(a) Connect the LAN cable between the LAN port (U1) on SSVP0 and the LAN board 1
(Management LAN port) on DKC-0.
(b) Connect the LAN cable between the LAN port (U3) on SSVP0 and the LAN board 1
(Management LAN port on the LAN board 1 in DKC-1.
Figure 9-23 Connecting LAN Cables
U3
U2
L3
L2
[U0]
U1-DKC0
LAN cable
HSNBX-0 前面
Front view of HSNBX-0
U1
U0
(SSVP 0)
(SSVP1)
L1
L0
[U2]
U3-DKC1
LAN cable
LAN cable kit
(SSVP0, U0-U3)
DKC-1
DKC-0
HSNBX-1
HSNBX-0
LAN board 2 (Management LAN port)
LAN board 1 (Management LAN port
DKC910I
Copyright © 2019, 2021, Hitachi, Ltd.
Rear view