Use the procedures in this chapter to test the electrical performance of the
synthesizer. hese tests do not require access to the interior of the instrument.
he synthesizer must warm up for at least one hour before the electrical
specications are valid.
Menus
Fold-out menu maps are located in Chapter 6. Some menus have more than
one page of softkeys. Select the
is not included in the keystrokes given in these procedures.
more
In all cases where you are instructed to preset the synthesizer,
Note
use the factory preset mode only.
Operator's Check
For assurance that most of the internal functions of the instrument work
(without testing for specications), see \Operator's Check," in the
.
Han book
Operation Verification Tests
o meet the needs of most incoming inspections
(80% verication), and provide reasonable assurance that the instrument
works, see the \Operation Verication" section of this chapter.
Automated Performance Tests
he automated performance tests available at time-of-shipment are included in
Chapter 5.
2-2 Performance Tests
All manuals and user guides at all-guides.com
softkey to view the next page of softkeys.
more
User's
HP 8360