Table 6
Vacuum purge - Initial State: Idle
State
Vacuum Purging
Idle
Table 7
Pump probe - Initial State: Idle
State
Pumping Probe
Idle
Detaching Probe
Figure 25
on page 63 and
software state transition diagram
CryoBay order of operations/conditions
Turbo pump on (a high pitch hum may be heard -
this is normal.
Pump out CryoBay vacuum system until low
vacuum.
Turbo pump off.
Close valves
CryoBay order of operations/conditions
Turbo pump on (a high pitch hum may be heard,
this is normal).
Turbo pump reaches full speed.
Turbo pump continues to pump.
Pump out CryoBay vacuum system until low
vacuum.
Open probe valve (indicator will appear on probe
valve).
Pump out probe.
Continues until user clicks Detach.
Close probe vacuum valve (popup button on probe
valve will disappear).
Turbo pump off.
Continues with the Detach operation.