Agilent Technologies Cryogenic User Manual page 55

Table of Contents

Advertisement

Cryogenic Systems Operation
• Temperature control of the cooling system.
• Warm- up.
Warm- up time for the probe and CCC is about six hours
using the accelerated warm- up. The CCC takes
approximately 48 hours to warm- up if the accelerated
warm- up is not used (because of power failure).
• Purging of helium from the cold loop in preparation for
probe detachment from the CryoBay.
Principles of Operation
55
4

Advertisement

Table of Contents
loading

Table of Contents