ZETRON 4000 Series Installation Manual page 34

Table of Contents

Advertisement

Common Control Equipment Installation
Adding DC Backup
To use 12 V
1. Measure the voltage at the BATT terminal (on the front of the supply) relative to
GND.
2. Measure the voltage at the +12V terminal.
3. Turn the 12V ADJ potentiometer clockwise until the +12V voltage is at least 0.2V
higher than the BATT voltage.
Table 6: Power Support Voltage Selection
Adjusting the Power Supply
The test points on the front of the unit are used to monitor the voltage levels. The +12V
has been set at the factory for +13.5V
setting. The -12V
test point reads the common voltage in a two-power-supply system. Use the following
adjustment procedure to verify the voltage being read is the supply being adjusted.
Single Power Supply
To adjust a system with one power supply
• Monitor the +5V
reads 5.18V
• Monitor the +12V
reads 13.5V
34
as a backup to the AC supply
DC
Input Supply
Universal AC
12 V
only
DC
AC and DC
supply has no adjustment and should be -11.7 ± 0.5 V
DC
Note
The 5V
supply has been adjusted to your system at the factory,
DC
but adding or removing cards changes the load and may require
you to adjust the 5V
test point and turn the ADJ potentiometer until the test point
DC
.
DC
test point and turn the ADJ potentiometer until the test point
DC
.
DC
JP1
JP2
YES
NO
NO
YES
YES
YES
. There is an adjustment potentiometer for this
DC
value.
DC
DC
. The 5V
DC
DC
025-9533Y

Advertisement

Table of Contents
loading

Related Products for ZETRON 4000 Series

This manual is also suitable for:

41184115b40184217b4219

Table of Contents