Maintenance work on the carrier
7.4 Fuel system
7 - 32
•
Open the two tank covers on the fuel tank;
à
p. 7 - 27.
•
Operate the hand pump (1) until you sense
definite resistance.
•
Close the two tank covers on the fuel tank.
•
Start the engine and check for leaks.
3 302 744 en
Maintenance manual
GMK5250L
Need help?
Do you have a question about the Grove GMK 5250L and is the answer not in the manual?