Preparing The Power Source - Fronius Robacta TX W Operating Instructions Manual

Torch body changeover system
Table of Contents

Advertisement

Preparing the power source

Preparing the
1
power source
2
On the power source being used, create a new job for advancing and winding back
the wire electrode
-
Wire threading speed: 600 cm/min (236.22 ipm)
Set filter time for flow watchdog to 25 seconds using RCU 5000i
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

4,044,008

Table of Contents