Installing the torch body changeover station - in con-
junction with VR 1500-PAP
Safety
General
Preparation
(1)
(2)
(3)
(3)
CAUTION! Risk of injury from compressed air escaping unintentionally. The torch
body changeover station must remain depressurised and de-energised until in-
stallation has been completed.
NOTE! For wire-feed units with the "Welding torch gas purging" option, limit the
gas purging pressure to max. 6.00 bar (87.02 psi).
(2)
Unscrew compressed air connection
1
(1) from junction valve
Screw compressed air connection pro-
2
vided (2) into junction valve as shown
-
Seal the compressed air connecti-
on using thread sealing tape
Secure junction valve on the mounting
3
plate (2) as shown using the screws
(3), washers and nuts provided
47