How to Replace a Disk Shelf I/O Module
Note -
system power indicator on the front of the disk shelf is lit a steady green, and that each power
supply with fan module status indicator on the rear is list a steady green. If not, power off the
disk shelf and reseat the faulted module. If the module status indicator is not a steady green
after module reinsertion, contact Oracle Customer Service.
12.
Go to the Maintenance > Hardware section of the BUI, and click the right-arrow
icon
failure, click either PSU or Fan to verify that the online icon
newly installed power supply with fan module.
How to Replace a Disk Shelf I/O Module
Caution -
shelf must not be operated without all components in place, including filler panels. Refer to
"Disk Shelf Hardware Overview" on page 234
The following disk shelves have I/O Modules (IOMs):
Oracle Storage Drive Enclosure DE2-24P
■
Oracle Storage Drive Enclosure DE2-24C
■
The I/O Modules (IOMs), which are similar to SIM boards, are hot-swappable so you can
replace them without removing power to the system.
258
Oracle ZFS Storage Appliance Customer Service Manual • February 2016
After the DE2-24 disk shelf powers on, which could take several minutes, ensure that the
at the beginning of the appropriate disk shelf row. As appropriate for the
Do not remove a component if you do not have an immediate replacement. The disk
for component locations.