Lifting And Mounting The Inverter - Advanced Energy AE 75TX Installation And Operation Manual

Table of Contents

Advertisement

Advanced
Energy
Figure 4-7.
Air
filter check
LIFTING AND MOUNTING THE INVERTER
The
inve1ter
base
is
designed to
allow
a
properly
rated
forklift to
lift
it from the front
or
back using
the
fork
slots.
a:F
Important
Before installing the
inve1ter,
make
sure
the pre-installation inspection
steps
have
been completed
and no issues have
been
identified.
Mounting Requirements
Mount the unit
on a flat surface
in
an
up1ight position.
The mounting
smface
must
comply with
all national
and
local
standards
for
weight, seismic,
and
wind
sheer
requirements.
The mounting
smface
must
be
prepared according
to the site specific
stmcttll'al
drawing.
Parts and Tools Required
4-6
Use
a
lifting
device
such
as
forklift
or
a
pallet jack
or an
alternate
method
of
lifting
and
positioning the inve1ter.
Lifting devices
must
be
rated for the
weight
of the
inve1ter.
Proper
lifting methods
may include:
0
Using a
crane
with
a strap
rated for the
weight of
the inve1ter
Installing
570-1001793-0SB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 100tx

Table of Contents