To Terminate The Inverter Network; To Set The Center Inverters For The Network - Advanced Energy AE 75TX Installation And Operation Manual

Table of Contents

Advertisement

Advanced
Energy®
AE
?STX and
AE
1 OOTX Inverters
Table
6-1.
Maximum network length per Modbus bit rate
Maximum Network
Maximum Network
RS-4851
Modbus Bit
Length Without
Length With Termination
Rate
Termination in Meters
(Feet)
in Meters
(Feet)
9600
bps
305
(1000)
1200
(4000)
19,200
bps
152
(500)
1200
(4000)
38,400
bps
76
(250)
1200
(4000)
57,600
bps
46
(150)
1200
(4000)
TO TERMINATE THE INVERTER NETWORK
If
bus
tennination
is
desired and the
inve1ter
is
on the end of the
Modbus
network,
you need to set the
tennination.
Verify that the J7 jumper
is
in the
lower,
NC position.
Move the
jumper
to the upper pair of Jl l pins labeled Line.
Verify that the J10
jumper
is
in the lower NC
position.
Table
6-2. Termination enabled for end device
Termination
Disabled
Enabled
High
(J7)
x
Line
(Ill)
x
Low (JlO)
x
TO SET THE CENTER INVERTERS FOR THE NETWORK
Inve1ters
in the center of the network need the temrination
jumpers
set to the disabled
position.
1.
Verify that the J7 jumper
is
in the lower NC position.
2. Verify that the Jl l
jumper
is
in the lower NC
position.
3. Verify that the J10
jumper
is
in the lower NC
position.
Table
6-3.
No termination or biasing (default setting)
Termination
Disabled
Enabled
High
(J7)
x
Line
(Ill)
x
570-1001793-0SB
Data Monitoring and
Controls
6-13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 100tx

Table of Contents