Advanced Energy®
AE
?STX and
AE
100TX Inverters
Installing
HANDLING AND UNPACKING
This
section
describes
the required safe handling and unpacking procedures for the
AE inve1ter. Always
follow
the recommendations in
this
section
to
prevent accidental
damage or
injmy
.
Packaging Contents
The following
items
are included with the inve1ter when it
is
packaged for
shipping:
•
Manual
•
WaITanty card
•
Final test
repo1
t
•
Keys for door handles
Handling and Unpacking the Inverter
TOOLS REQUIRED
•
Two
9/16" wrenches
or one wrench and one
9/16"
socket wrench
•
Lifting device such
as
a forklift or pallet
jack
•
Utility knife
The
inve1ter
can be moved using a forklift or pallet jack that is rated to handle a
minimmn of
1452
kg (3200
lb).
TO UNLOAD AND UNPACK THE INVERTER
LL
WARNING:
Heavy equipment.
AE 7'5fX/AE
100TX
units weigh up
to
1452 kg (3200
lb)
with pallet and
packaging.
If the unit
is
lifted
incorrectly,
it
may
result in
death.
In
addition,
improper handling
may
result in serious
damage
to
the
unit and
may
also void the
warranty.
Keep all doors
securely
closed while moving the
unit.
Only
use lifting equipment that
is
rated for
the
weight of
the
unit.
Only
use the specified lifting
points.
570-1001793-0SB
Installing
4-1