Chapter 4. Installing; Handling And Unpacking; Packaging Contents; Handling And Unpacking The Inverter - Advanced Energy AE 75TX Installation And Operation Manual

Table of Contents

Advertisement

Advanced Energy®
AE
?STX and
AE
100TX Inverters
Installing
HANDLING AND UNPACKING
This
section
describes
the required safe handling and unpacking procedures for the
AE inve1ter. Always
follow
the recommendations in
this
section
to
prevent accidental
damage or
injmy
.
Packaging Contents
The following
items
are included with the inve1ter when it
is
packaged for
shipping:
Manual
WaITanty card
Final test
repo1
t
Keys for door handles
Handling and Unpacking the Inverter
TOOLS REQUIRED
Two
9/16" wrenches
or one wrench and one
9/16"
socket wrench
Lifting device such
as
a forklift or pallet
jack
Utility knife
The
inve1ter
can be moved using a forklift or pallet jack that is rated to handle a
minimmn of
1452
kg (3200
lb).
TO UNLOAD AND UNPACK THE INVERTER
LL
WARNING:
Heavy equipment.
AE 7'5fX/AE
100TX
units weigh up
to
1452 kg (3200
lb)
with pallet and
packaging.
If the unit
is
lifted
incorrectly,
it
may
result in
death.
In
addition,
improper handling
may
result in serious
damage
to
the
unit and
may
also void the
warranty.
Keep all doors
securely
closed while moving the
unit.
Only
use lifting equipment that
is
rated for
the
weight of
the
unit.
Only
use the specified lifting
points.
570-1001793-0SB
Installing
4-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 100tx

Table of Contents