Figure 4‑11. Air filter check
This completes the pre-installation inspections.

LIFTING AND MOUNTING THE INVERTER

The inverter base is designed to allow a properly rated forklift to lift it from the front
or back using the fork slots.
 Important
Before installing the inverter, make sure the pre-installation inspection steps
have been completed and no issues have been identified.
Mounting Requirements
When mounting the inverter, consider the following requirements:
• Mount the unit on a flat surface in an upright position.
• The mounting surface must comply with all national and local standards for
weight, seismic, and wind sheer requirements.
• The mounting surface must be prepared according to the site specific structural
drawing.
Required Tools
• Lifting device such as forklift or a crane may be used to lift and position the
inverter. Lifting devices must be rated for 4,140 kgs (9,100 lbs). Proper lifting
methods may include:
◦ Using a crane with a strap rated for the weight of the inverter
4‑10
4680
Installing