General Requirements For Planning And Installation; Handling The Inverter - Advanced Energy AE 75TX Installation And Operation Manual

Table of Contents

Advertisement

Advanced Energy®
AE
?STX and
AE
100TX Inverters
Planning
GENERAL REQUIREMENTS FOR PLANNING
AND INSTALLATION
Planning
for
an installation of an AE inve1ter should only be pe1fonned by qualified
engineers
who have a
thorough
understanding of the processes involved for a
successful
installation.
Licensed
and trained installers
must
comply with all local and
national
code
requirements
for
the installation of
electdcal
power systems
with
AC
and DC
voltages
up to 600
V.
The inve1ter
must
be anchored to a concrete mounting pad. The mounting pad
must
meet
local
seismic
requirements. Refer to
the
mechanical
drawings in this
manual
for
seismic-rated concrete pad mounting requirements.
HANDLING THE INVERTER
LL,
WARNING:
Heavy equipment.
AE 7'5fX/AE
100TX
units
w
eigh up to 1452 kg (3200
lb)
with pallet and
packaging.
If the unit is lifted
incorrectly,
it
may
result in
death.
In
addition,
improper handling
may
result in serious
damage
to
the
unit and
may
also void the
warranty.
Keep all doors
securely
closed while moving the
unit.
Only
use lifting equipment that
is
rated for the weight of
the
unit.
Only
use
the specified lifting
points.
fil_
A
VERTISSEMENT:
Equipement
lourd.
Les unites AE 75TX/AE
100TX pesent
jusqu'a 1452 kg
(3200
lb)
avec palettes et
emballage.
Tout levage inadequat de
l'unite
peut
provoquer la
mort.
De
plus,
toute manipulation
inadequate
peut provoquer
des dommages graves a l'unite et pourrait
aussi
annular la
garantie.
Garder
toutes les portes bien fermees
lors
du deplacement de
l'unite.
Utiliser
uniquement un equipement
de levage
d'une capacite nominale convenant au
poids de
cette unite.
Utiliser uniquement les
points
de
levage specifies.
The inve1ter
can
weigh up to
1452
kg
(3200
lb)
with
the pallet and
packaging.
If the
inve1ter is improperly
handled,
sedous
damage can occur and the wananty may be
voided.
Only use lifting equipment that is rated for the weight of the
inve1ter
.
Only
use the specified lifting
points.
Leave the inve1ter
on
its shipping pallet
with
the
protective
plastic wrap in place until it
is
time to install.
570-1001793-0SB
Planning
3-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 100tx

Table of Contents