Table 7-1.
Maintenance checklist
Item#
Check or Procedure
Maintenance
Cycle
General inspection
and cleaning
1
Record
general site conditions.
Annually
2
Record inve1ter pe1f01mance data from
inve1
ter display.
Annually
3
Record environmental conditions.
Annually
4
Remove dilt and debtis from underneath the
inve1
ter.
Annually
5
Inspect
and
touch up damage to
exte1ior
paint.
Annually
6
Inspect and clean interior of
inve1
ter.
Annually
7
Inspect cabinet air filters and clean
or
replace.
Annually
8
Inspect card cage air filters and clean
or
replace.
Annually
9
Inspect and replace
seals
if necessa1y.
Annually
10
Confum presence
of product
documentation.
Annually
Connections
and
wiiing
11
Complete
visual
inspection
of
electrical
connections and
wiling.
Annually
12
Complete mechanical inspection of
connections
and
wiling.
Annually
13
Measure torque of all electtical connections and re-torque as
Annually
needed.
14
Complete
the1mal
scan
of
inve1
ter
connections, wiling,
and
Annually
electronics.
15
Complete the preventative maintenance repo1t and
Annually
recommendation.
Replace
16
Replace
cabinet
air
filters
.
Eve1
y
2
years
17
Replace
batte1
y
in communications
inte1
face PCB.
When a
Real
Time Clock
enor
occurs in
Modbus status
register 42005
18
Replace AC transient voltage
surge
suppression
system
Eve1
y
10
years
or
when
red
indicator
visible
19
Replace DC transient voltage
surge
suppression
system
Eve1
y
10
years
or
when
red
indicator
visible
20
Replace door
seals
Eve1
y
10
years
21
Replace
fans/blowers
Eve1
y
10
years
570-1001793-0SB
Maintenance
7-3