Visual Inspection; Maintenance Schedule - Advanced Energy AE 75TX Installation And Operation Manual

Table of Contents

Advertisement

Advanced Energy
VISUAL INSPECTION
,&
DANGER:
Risk of electrical
shock.
High voltages are present in the inverter cabinet.
Both AC and DC disconnects must be in the OFF position when working on
the unit. Wait five minutes to discharge high voltage
before
opening
the
front
panels
of
the inverter.
,&
DANGER:
Risque
d'electrocution.
L'interieur de l'onduleur est soumis
a
des hautes
tensions. Les interrupteurs de courant altematif et continu doivent etre mis
HORS TENSION durant les travaux sur
!'unite.
Attendez cinq minutes afin de
permettre la decharge du courant haute tension avant de demonter les
panneaux
avant de
l'onduleur.
,&
DANGER:
RISK OF DEA TH OR
BODILY INJURY.
Disconnect and lockout/tagout all
sources of input power before working on this unit or anything connected to
it.
fil
DANGER:
RISQUE DE MORT OU DE BLESSURES
CORPORELLES.
Debrancher et
verrouiller/etiqueter toutes les sources de puissance
d'entree
avant de
travailler sur cette unite ou sur tout element qui
y
est raccorde.
AE recommends
visually
inspecting the inve1ter eve1y time it is
serviced.
Sta1t
by
observing
the
front, back,
and
sides
of the
inve1ter
for
damage,
foreign
objects,
or
dust and
debris
that may have accumulated around the
inve1ter.
Remove <lilt and
debris from the area around the
inve1
ter at
least
eve1y
six
months.
MAINTENANCE SCHEDULE
7-2
The following maintenance should be pe1f 01med annually by a qualified
service
person. Please refer to AE's Te1ms and Conditions
of
Sale for wananty-related items.
Complete the maintenance checklist below and
save
the
info1
mation for
your
records.
Maintenance
570-1001793-058

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 100tx

Table of Contents